The other five wells will be water injectors. The production wells will be drilled from two drill centers located at water depths of 1,345ft. The subsea infrastructure will be tied back to the Knarr FPSO. The FPSO will have a capacity of 63,000 barrels per day and a design life of 20 years. The vessel will require maximum power of 32.85MW with topsides weighing 15,000 t.
Year | 2013 |
---|---|
Owner | BG Norge |
Engineer | Subsea 7 |
Country | United Kingdom |
Sector | Offshore |
Segment | Subsea |
Application | Subsea Pipeline |
Product type | Aquaduct CL 10 |